What is the minimum lot size for an on-site wastewater treatment system (OWTS)?

We do not have a minimum lot size requirement. Local planning agencies do have minimum lot sizes in their zoning codes. They typically recommend a minimum of one acre for lots supplied by central water and 2.5 acres for lots with wells.

Show All Answers

1. Under what conditions must an OWTS be designed by a Colorado Licensed Professional Engineer?
2. I am selling my property and need to get my waste water system certified. What should I do?
3. What is the minimum lot size for an on-site wastewater treatment system (OWTS)?
4. How often do I need to pump my septic tank?
5. Will I be able to irrigate or have horses where my Soil Treatment Area (STA) is located?
6. Can I install a bathroom in a garage, barn, etc., and connect it to my existing on-site wastewater treatment system (OWTS)?
7. I am unsure where my on-site waste water treatment system (OWTS) is located. Do you have records of my system?
8. I accidentally damaged some components of my septic system. Who should I call to inspect and repair the damage? Do I need a permit?